Studies of the first, second and third stages (monitoring services) of Dolat Abad highway and existing intersections and bridges within the plan
Studies of the first, second and third stages (monitoring services) of Dolat Abad highway and existing intersections and bridges within the plan
Studies of the first, second and third stages (monitoring services) of Dolat Abad highway and existing intersections and bridges within the plan
Studies of the first, second and third stages (monitoring services) of Dolat Abad highway and existing intersections and bridges within the plan
The third stage services (higher supervision and workshop) on the implementation of the Imam Ali highway project between Pirouzi Street and Shahid Mahalati Square
The third stage services (higher supervision and workshop) on the implementation of the Imam Ali highway project between Pirouzi Street and Shahid Mahalati Square
The third stage services (higher supervision and workshop) on the implementation of the Imam Ali highway project between Pirouzi Street and Shahid Mahalati Square
Studies of the first, second and third stages (monitoring services) of the retrofitting of the bridge at the intersection of Sheikh Fazlullah Nouri-Jalal Al Ahmad highway (test bridge)
Studies of the first, second and third stages (monitoring services) of the retrofitting of the bridge at the intersection of Sheikh Fazlullah Nouri-Jalal Al Ahmad highway (test bridge)
Studies of the first, second and third stages (monitoring services) of the retrofitting of the bridge at the intersection of Sheikh Fazlullah Nouri-Jalal Al Ahmad highway (test bridge)
Studies of the first, second and third stages (monitoring services) on the implementation of arterial canals C of Mesil Sorekh Hesar
Studies of the first, second and third stages (monitoring services) on the implementation of arterial canals C of Mesil Sorekh Hesar
Studies of the first, second and third stages (monitoring services) on the implementation of arterial canals C of Mesil Sorekh Hesar
Monitoring services for the operations of parts 1 to 4 of strengthening the Zarin Shahr-Bafeq railway bridge in order to increase the axle from 20 tons to 25 tons
Studies of the first, second and third stages (monitoring services) of seismic improvement of existing bridges in the railways of Azerbaijan and the south of the country
Studies of the first, second and third stages (monitoring services) of the seismic improvement of the bridge at the intersection of Sheikh Fazlullah Nouri Highway and Sattar Khan Street
Studies of the first phase of two intersection devices and five bridge devices in the four-lane project of the Qazvin-Boin Zahra axis
Studies of the first and second stages of the non-level intersections of Isar Square and De Majnoon, Kermanshah
Studies of the first and second stages of the non-level intersection of Jhanbazan Blvd. and Zan Blvd. in Kermanshah
Studies of the first and second stages of the connection of the continuation of Azadrah Hakim to Bazarrgarah Fatah (Karvansarsangi intersection)
Providing consulting engineer services to the employer in the projects of repair, improvement, reconstruction and retrofitting, increasing the axial load and increasing the capacity of railway bridges in some areas and railway regions of I.R.I.
High-level and workshop supervision of specialized repair operations, maintenance and retrofitting of some bridges in Tehran, and specialized repair and restoration of southeast span bridges
Studies of the first and second stages of the seismic improvement of the building of the old Nursing College and Shahid Rajaei Pharmacy in Zanjan