Studies of the first, second and third stages (monitoring services) of the retrofitting of the bridge at the intersection of Sheikh Fazlullah Nouri-Jalal Al Ahmad highway (test bridge)
Studies of the first, second and third stages (monitoring services) of the retrofitting of the bridge at the intersection of Sheikh Fazlullah Nouri-Jalal Al Ahmad highway (test bridge)
Studies of the first, second and third stages (monitoring services) of the retrofitting of the bridge at the intersection of Sheikh Fazlullah Nouri-Jalal Al Ahmad highway (test bridge)
Monitoring services for the operations of parts 1 to 4 of strengthening the Zarin Shahr-Bafeq railway bridge in order to increase the axle from 20 tons to 25 tons
Studies of the first, second and third stages (monitoring services) of seismic improvement of existing bridges in the railways of Azerbaijan and the south of the country
Studies of the first, second and third stages (monitoring services) of the seismic improvement of the bridge at the intersection of Sheikh Fazlullah Nouri Highway and Sattar Khan Street
Providing consulting engineer services to the employer in the projects of repair, improvement, reconstruction and retrofitting, increasing the axial load and increasing the capacity of railway bridges in some areas and railway regions of I.R.I.
High-level and workshop supervision of specialized repair operations, maintenance and retrofitting of some bridges in Tehran, and specialized repair and restoration of southeast span bridges
Studies of the first and second stages of the seismic improvement of the building of the old Nursing College and Shahid Rajaei Pharmacy in Zanjan